In Stock & Ready to Freight Power Equipment Old stock

Ariens Professional SSRC (21″) 208cc Single-Stage Snow Blower 938025

Part no: 938025
Brand: Ariens
Condition: New
Regular price $492.18 Save $147.65
Sale price $344.53
Sale price ends Mon Nov 30, 11:59 PM PT
+ freight from $185.00, insured LTL, priced by delivery zone (rates)
From $529.53 delivered
  • Palletized and heavy shrink-wrapped for freight
  • LTL carrier delivery with optional liftgate service
  • Ships in 1–2 business days from Los Angeles, CA
  • Transit typically 3–14 business days, continental US
Ask a question about this unit

Need a matched transmission, controls or wiring package? Speak with a parts specialist.

Details & Inspection Notes

The SSRC shares the SSR's 208cc engine, 21-inch width, and all-steel housing, but swaps manual chute rotation for a mechanical remote control operated from the handlebar instead of reaching to the chute itself.

What the remote control changes

On the plain SSR, aiming the chute means adjusting it by hand at the housing; here that adjustment is mechanical and remote, saving a step mid-pass on a busy job. The easy-load handlebar system and recoil start carry over unchanged.

Built for repeat use

All-steel housing and skid shoes match the SSR, aimed at single-stage machines seeing frequent, lighter clearing rather than rare deep storms.

One more part to maintain

A remote chute linkage is one more mechanical part than the plain SSR's hand-adjusted chute, so a drop of oil on that linkage at the start of the season is worth adding to a normal maintenance routine. A linkage that moves freely before the first storm is less likely to bind once it is coated in cold, wet snow, which matters most in the middle of a job when stopping to force it by hand is the last thing you want to do.

How is chute aim adjusted? Mechanically, by a remote control at the handlebar rather than by hand at the housing.

Start type and coverage? Recoil start, model 938025, 3-year consumer warranty, new.

What colour is it? It comes in the factory orange and black finish.

Equipment Commissioning & Pre-Start Checklist

  • Check engine oil, hydraulic fluid, and coolant levels to manufacturer-specified dipstick/sight-glass marks.
  • Inspect fuel shut-off valve, air filter element, and hydraulic hose fittings for secure connections.
  • Verify all safety pins, locks, hydraulic couplers, and guards are secured before starting.
  • Allow a 3–5 minute warm-up period at low idle to circulate lubricants and hydraulic oil prior to applying load.

Full terms: 30-day warranty · returns